by biddgroup | Jun 3, 2015 |
POINT COOK COASTAL PARK – STAGE ONE Client Excell Gray Bruni Location Point Cook Overview BIDD Construction Group constructed the final section of out fall for this Stage 1 sub-division. Caution had to be taken during construction with major works around live...
by biddgroup | Jun 3, 2015 |
NONNA SOFIA DAIRY FOODS Client Nonna Sofia Dairy Foods Location Campbellfield Overview BIDD Construction Group constructed and installed a trade waste system with a triple interceptor and neutraliser pits. Open grates and silt traps were used along with super sleeve...
by biddgroup | Jun 3, 2015 |
ALD LINEN SERVICES Client ALD Linen Location Campbellfield Overview ALD Linen Services is a commercial laundry which supplies a number of Melbourne hotels with clean linen including Crown Casino. BIDD Construction Group were engaged in the design and development of...
by biddgroup | Jun 3, 2015 |
PADUA COLLEGE Client Padua College Location Tyabb Overview This project involved the stormwater drainage installation for a new campus, including culverts, rock beaching and end walls. Interested In Working With Us? Get In...
by biddgroup | Jun 1, 2015 |
HUME SECONDARY COLLEGE Client Hume Secondary College Location Broadmeadows Overview BIDD Construction Group were engaged to divert and reconstruct a new sewage drain through existing garden beds and pathways. The original alignment had no grade so a new alignment was...