BUNURONG CEMETARY
Client
Civiworks P/L
Location
Bunurong / Frankston
Overview
A new chapel was constructed at the Bunurong cemetery as well as a new toilet block. BIDD Construction Group constructed and installed a new wet well and rising main that was connected into an existing rising main 3.5m deep. New road drainage pits and driveable end walls were also installed.